How we build

Raw log to finished product.

The phrase is literal. Here is what actually happens, and what you are doing while it does.

01

Site visit and scope

We walk the ground before we talk numbers. Access, drainage, where the sun lands and where the wind comes from decide more about the building than the floor plan does.

02

Design and drawings

We design and build, or we build to your architect’s plans — either works.

03

A price, not a meter

You get a fixed scope and a fixed number. We don’t run cost-plus.

04

Ground work

Road, clearing, pad, footings, utilities. Our own machines, our own schedule.

05

Log selection and scribing

Logs chosen, peeled and scribed. This is the slow part and the part that makes the building.

06

Raising

Walls and trusses set. The fastest and most dramatic week of the job — worth being there for.

07

Dry-in

Roof and closure before weather. In this valley that deadline drives everything upstream of it.

08

Finish and hand-over

Interior trades, final grade, and a walk-through. Log buildings settle — we come back and check.